How JustAnswer Works:
  • Ask an Expert
    Experts are full of valuable knowledge and are ready to help with any question. Credentials confirmed by a Fortune 500 verification firm.
  • Get a Professional Answer
    Via email, text message, or notification as you wait on our site.
    Ask follow up questions if you need to.
  • 100% Satisfaction Guarantee
    Rate the answer you receive.
Ask F. Naz Your Own Question
F. Naz
F. Naz, Chartered Accountant
Category: Writing Homework
Satisfied Customers: 5319
Experience:  Experience with chartered accountancy
20040807
Type Your Writing Homework Question Here...
F. Naz is online now
A new question is answered every 9 seconds

Your development team is working on the version 1.0 of a

Customer Question

Your development team is working on the version 1.0 of a software code base. This version will be the main version used for team X. Beyond that point the development team will start working on version 2.0 for team Y. However, the team should maintain version 1.0 based on the bugs found by team X and these fixes should be always applied to the 1.0 version and also to 2.0 code stream. However, bugs found in the 2.0 stream should be applied to the 1.0 code stream after close consideration to make sure that version 1.0 is not disturbed.
In order to keep track of the development and the versions under development, you will need a repository for the software that includes mechanisms for recording and tracking versions.
Based on the above scenario and your understanding, you need to:
Identify and explain the best way to configure your repository to allow for maximum flexibility and maximum stability for your released code.
Develop a method for configuring and managing a software rep
Submitted: 1 year ago.
Category: Writing Homework
Customer: replied 1 year ago.
3-5 pages long and have references
Customer: replied 1 year ago.
Consider the following scenario: You are part of a development team that will start working on version 1.0 of a software project. The schedule indicates that this version needs to be available to customers in 6 months. After the release of version 1.0, the team will start work on the next version (2.0). A bug reporting system will be in place when the code is released for customers to report bugs against version 1.0, and the team intends to fix these bugs in both versions (1.0 and 2.0) in parallel. Once enough bugs are fixed in version 1.0, the team may release a new version 1.1, and then a subsequent version 1.2, and so on. However, bugs found during the development of version 2.0 will need to be analyzed to see if they also exist in version 1.0. For instance, if the development team determines that a bug filed against version 2.0 is also a bug in version 1.x, the team may need to fix that bug in both versions.
In order to keep track of the development and the versions under development, you will need a repository for the software that includes mechanisms for recording and tracking versions. Based on the above scenario, consider the best way to configure your repository to allow for maximum flexibility and maximum stability for your released code.
For this Assignment, develop a method for configuring and managing a software repository based on the above scenario. After creating the solution, research available version control tools, and select the tool you believe to be the best to implement your solution with. Create a 3- to 5-page paper that includes:
A detailed description of how you would configure and manage your repository, focusing on required flexibility and stability
A table of version control tools that you researched, including a description of each tool, and strengths and weaknesses of each tool with respect to your configuration solution
The version control tool you decided on for implementation, along with a justification explaining why you believe this tool was the best fit
A specification of how you would set up and configure the tool to effectively handle your solution
Customer: replied 1 year ago.
looks as though this question was answered a year ago. It has to be different then the one a year ago.
Expert:  F. Naz replied 1 year ago.

Thanks for the acceptance, please mention the deadline so I can deliver the answer before that.

Expert:  F. Naz replied 1 year ago.

Sorry this message has been sent to you by mistake, thanks.

Customer: replied 1 year ago.
what was the mistake?
Expert:  F. Naz replied 1 year ago.

The above message.

Customer: replied 1 year ago.
you want to know the deadline?
Customer: replied 1 year ago.
If you want to know the deadline, it is tomorrow afternoon.
Expert:  F. Naz replied 1 year ago.

No, I am not able to provide you the answer of this question as I am out of resources, thanks.

Customer: replied 1 year ago.
Please opt out, I need an answer from a different Expert.
Expert:  F. Naz replied 1 year ago.

Okay.

Related Writing Homework Questions