How JustAnswer Works:
  • Ask an Expert
    Experts are full of valuable knowledge and are ready to help with any question. Credentials confirmed by a Fortune 500 verification firm.
  • Get a Professional Answer
    Via email, text message, or notification as you wait on our site.
    Ask follow up questions if you need to.
  • 100% Satisfaction Guarantee
    Rate the answer you receive.
Ask walkereng Your Own Question
walkereng
walkereng, Consultant
Category: Structural Engineering
Satisfied Customers: 2504
Experience:  Over 30 years of Structural Engineering experience.
61772417
Type Your Structural Engineering Question Here...
walkereng is online now
A new question is answered every 9 seconds

I have a question. I have an 8000 lb point load over an

Customer Question

Hi
JA: Hi. How can we be of help?
Customer: I have a question.
JA: OK. Tell me a bit more about what's going on so we can help you best.
Customer: I have an 8000 lb point load over an opening 7' opening and the engineer has called for a triple 2x12 header with two half inch plywood sheets between 2x12....creating a 5.5" beam. 8000 # sounds like a lot.
JA: Is there anything else important you think the Structural Engineer should know?
Customer: No
Submitted: 12 days ago.
Category: Structural Engineering
Expert:  StructuralEng replied 12 days ago.
No. I can help.
Expert:  StructuralEng replied 12 days ago.
Was the species and grade of lumber specified?
Expert:  StructuralEng replied 12 days ago.
My calculations show that beam is significantly overstressed unless it is a select structural quality lumber