How JustAnswer Works:

  • Ask an Expert
    Experts are full of valuable knowledge and are ready to help with any question. Credentials confirmed by a Fortune 500 verification firm.
  • Get a Professional Answer
    Via email, text message, or notification as you wait on our site.
    Ask follow up questions if you need to.
  • 100% Satisfaction Guarantee
    Rate the answer you receive.

Ask walkereng Your Own Question

walkereng
walkereng, Consultant
Category: Structural Engineering
Satisfied Customers: 2590
Experience:  Over 30 years of Structural Engineering experience.
61772417
Type Your Structural Engineering Question Here...
walkereng is online now
A new question is answered every 9 seconds

Concrete slab 16x24 was poured 4 months ago and dried and

Customer Question

concrete slab 16x24 was poured 4 months ago and dried and now has raised up 1 1/2 inches on one end. what causes this and how do you fix the problem
Submitted: 9 months ago.
Category: Structural Engineering
Expert:  walkereng replied 9 months ago.

I can help

Expert:  walkereng replied 9 months ago.

Have you had any significant rain events since the slab was poured?

Customer: replied 9 months ago.
a ice storm
Expert:  walkereng replied 9 months ago.

It sounds like you could possibly have some expandable clay soil under your slab and when the one end got the soil saturated, the clay expanded and raised the slab up the 1.5"

Expert:  walkereng replied 9 months ago.

Did you ask the question again on the site?

Expert:  walkereng replied 9 months ago.