How JustAnswer Works:

  • Ask an Expert
    Experts are full of valuable knowledge and are ready to help with any question. Credentials confirmed by a Fortune 500 verification firm.
  • Get a Professional Answer
    Via email, text message, or notification as you wait on our site.
    Ask follow up questions if you need to.
  • 100% Satisfaction Guarantee
    Rate the answer you receive.

Ask StructuralEng Your Own Question

StructuralEng
StructuralEng, Consultant
Category: Structural Engineering
Satisfied Customers: 6682
Experience:  Structural Engineer
59685895
Type Your Structural Engineering Question Here...
StructuralEng is online now
A new question is answered every 9 seconds

We poured a concrete pad we did not get to smooth out before

Customer Question

we poured a concrete pad we did not get to smooth out before it set up. There is a few holes not large adn low spots how can we fix it.
Submitted: 1 year ago.
Category: Structural Engineering
Expert:  StructuralEng replied 1 year ago.

Was it vibrated and properly consolidated?

Expert:  StructuralEng replied 1 year ago.

It is a slab on grade, correct? How thick is it? Is it reinforced?

Customer: replied 1 year ago.
not vibrated, slab on grade, 3 to 3 1/2 inches thick
Expert:  StructuralEng replied 1 year ago.

So it might be 2" where it dips down? What is it supporting?

Expert:  StructuralEng replied 1 year ago.

I would replace it. That's poor construction. It won't meet any spec or standard construction practice. Require it to be replaced.

Customer: replied 1 year ago.
its not 2" where it dips down and it for sidewalk purpose, we can't afford to remove it.
Expert:  StructuralEng replied 1 year ago.

You can't fix uncondilidated concrete. It will crack all over and fail long before it should. It's not acceptable construction

Expert:  StructuralEng replied 1 year ago.

Hello. Do you have any other questions for me on this topic? If you could rate my answer, I would appreciate it.