1. Electricity produces work when the electrons in a conductor
D. are placed in motion.
2. The electrician's main source of information about electrical installation rules and regulations is the
A. National Electrical Code.
3. The best time to install conduit is when you're
B. wiring new construction with open walls
4. An underground electrical distribution system would most likely be found
D. in a downtown area
5. Which of the following electrical characteristics remains the same during normal residential electrical use?
C. The voltage level
6. A service drop to a residence is connected to the utility's _______ voltage.
A. primary
7. The chief purpose of a service panel in a house is to
C. provide automatic circuit protection.
8. How many outlets are allowed on a 240 V branch circuit?
A. 1
B. 3
C. 6
D. 9
9. A home electrical system is joined to the electric company's system at the junction of the
A. entrance head and service drop.
10. Electrical pressure is also called
B. amperage.
11. The hot wires in a service entrance panel are covered with _______ insulation.
D. red or black
12. The electric meter for a new house is furnished by the
C. electric company.
13. A small appliance circuit will be protected by a circuit breaker rated at
B. 20 A.
14. A 120 V general-purpose circuit should have circuit breakers or fuses with values of
A. 15 A or 20 A.
15. Which of the following voltages would most likely be used as a primary distribution voltage by an electric utility company?
D. 69,000 V
16. Which of the following wire gage sizes is the thickest?
B. 8
17. A new home will have a service entrance with a minimal current rating of
.
D. 200 amperes.
18. The main consideration when choosing an appropriate outlet box is for the box to
D. have the correct capacity.
19. A three-wire installation provides a power source for a _______ service.
B. 120/240 V
20. Which of the following formulas would you use to calculate the power requirements of an electrical load?
D. P = E/R