I will attach the information:
Removing And Installing/sealing Left Cylinder Head Cover (N62) (Cylinder Bank 5 to 8) Remove design cover. Remove acoustic cover. Remove center of assembly partition wall. Remove ignition coil cover.Note: For purposes of clarity, the following work steps are shown on the engine after it has been removed.Installation: The cylinder head cover and its gasket are made from a single material which adapts to the contour of the cylinder head.The gasket and uncoupling elements of the screw connection are matched to each other.If the cylinder head cover was leaking, the fault can only be rectified with a new cylinder head cover, new gasket and new screw connections.
Removing And Installing/sealing Right Cylinder Head Cover (N62) (Cylinder Bank 1 to 4) Remove design cover. Remove acoustic cover. Remove center of assembly partition wall. Remove electronics box cover. Remove electronics box seal. These work steps are described in the section "Replacing control unit". Remove ignition coil cover. Remove intake filter housing (without raw air housing).Remove intake hose with air-mass flow sensor.Installation: The cylinder head cover and its gasket are made from a single material which adapts to the contour of the cylinder head.The gasket and uncoupling elements of the screw connection are matched to each other.If the cylinder head cover was leaking, the fault can only be rectified with a new cylinder head cover, new gasket and new screw connections.Note: For purposes of clarity, the following work steps are shown on the engine after it has been removed.
If you don't get the pics now let me know and I will reformat them.
ASE Certified Technician
ASE Certified Technician, 17 years experience, Delaership Certified, Service Manager for 15 years